follow us:Google+FacebookLinkedInTwitterVimeoRSS Feeds

advertisement

York County firm to start I-83 bridge replacement

By - Last modified: May 2, 2012 at 12:15 PM

Back to Top Comments Email Print

York County-based Susquehanna Valley Construction Corp. on Friday will begin the project of replacing the Lowther Street bridge over Interstate 83 in Lemoyne as part of the ongoing reconfiguration of the highway's notorious York Split.

Susquehanna Valley Construction will begin shifting the road to a temporary bridge just north of the existing span, a functionally obsolete bridge built in 1952 that must be removed if the state is to improve the I-83 and Route 581 interchange, PennDOT said today in a statement.

PennDOT awarded the $8 million contract to Fairview Township-based Susquehanna Valley Construction on March 28, it said. The contract includes:

• Temporary bridge installation.

• Removal of the existing Lowther Street bridge.

• Construction of a new two-span bridge to accommodate four lanes of mainline I-83 and three ramps underneath.

• Reconstruction of the roadway approaches.

• New drainage, guiderail and signs.

Construction management on the project is being done by the Harrisburg office of Michael Baker Jr. Inc.

The reconstruction of the York Split is expected to be complete by 2015.


View Larger Map

Jim T. Ryan

Jim T. Ryan

Jim T. Ryan covers Cumberland County, manufacturing, distribution, transportation and logistics. Have a tip or question for him? Email him at jimr@cpbj.com. Follow him on Twitter, @JimTRyanCPBJ.

advertisement

Comments


Be the first to comment.



Please note: All comments will be reviewed and may take up to 24 hours to appear on the site.

Post Comment
     View Comment Policy
advertisement
  
  
advertisement
  
  
advertisement
Back to Top